DanR
Diamond Level Sponsor
I have attempted to purchase replacement part for some hard tops (LATE SERIES) I have from a source in the UK. Radford Panels fabricates and sells these parts but states they no longer ship outside the UK.
The pieces I need are:
SA 87 SA 88 HARD TOP SIDE RAIL WINDOW REPAIR
SA 89 SA 90 HARD TOP PART BACK AND VERTICAL SIDE
SA 91 HARD TOP REAR WINDOW BACK RAIL COMPLETE
SA 92 SA 93 HARD TOP VERTICAL SIDE ( CORNER KIT )
Do any of you know what can be done (within reason) to purchase these items and items of interest?
If there is a member of our SAOCA that lives in the UK that would purchase these items a VAT will most likely be included. Perhaps that could be bypassed if there are to be shipped to the US. Is there a viable solution?
Any solutions, suggestions, comments?
Here is RADFORD'S Response:
Hello Dan
Thank you for your enquiry, please find attached our current parts list with prices.
All our panels are hand manufactured to order and current completion is approx. 3-4 months from receipt of order and payment due to backorders.
Payment can be made by bank transfer. Please note – all our prices do not include carriage costs or vat.
If you require any further assistance, please do not hesitate to contact me.
Kind regards
Caron
Radford Panel Co Ltd
Please Note : We are currently not exporting
The pieces I need are:
SA 87 SA 88 HARD TOP SIDE RAIL WINDOW REPAIR
SA 89 SA 90 HARD TOP PART BACK AND VERTICAL SIDE
SA 91 HARD TOP REAR WINDOW BACK RAIL COMPLETE
SA 92 SA 93 HARD TOP VERTICAL SIDE ( CORNER KIT )
Do any of you know what can be done (within reason) to purchase these items and items of interest?
If there is a member of our SAOCA that lives in the UK that would purchase these items a VAT will most likely be included. Perhaps that could be bypassed if there are to be shipped to the US. Is there a viable solution?
Any solutions, suggestions, comments?
Here is RADFORD'S Response:
| Wed, Oct 12, 2022, 10:09 AM | |||
|
Hello Dan
Thank you for your enquiry, please find attached our current parts list with prices.
All our panels are hand manufactured to order and current completion is approx. 3-4 months from receipt of order and payment due to backorders.
Payment can be made by bank transfer. Please note – all our prices do not include carriage costs or vat.
If you require any further assistance, please do not hesitate to contact me.
Kind regards
Caron
Radford Panel Co Ltd
Please Note : We are currently not exporting